Sunday, April 18, 2010

2nd week

12-4-2010
  • Change the filter element at S53201 (cooling water) and S33251B (amine)
  • Have a meeting with Mr. Bakeri Wahab. He is the executive (mechanical supervisor) at area 5.
  • He gave a brief overview on area 5
  • Basically area 5 contains
utilities
  • steam
  • water
  • air
  • nitrogen gas
  • flare
Sulphur Recovery Unit
  • amine recovery unit
  • sour water treatment unit
  • waste heat boiler
Cogen
  • Steam turbine generator
  • gas turbine generator
  • cooling tower
13-4-2010
  • went to AMT5 (cogen). met Mr. Zuhar
  • He gave an overview on cogen
  • cogen contains 5 gas turbine generators, 1 steam turbine generator, and 2 cooling towers
  • cogen use a combine cycle concept
  • combine cycle concept is the concept where the exhaust gas from the combustion chamber in gtg is recover and it is use as a heating element in a boiler. the steam is then use to generate power at steam turbine generator (stg)
  • visit blowdown pit (an underground pond used to collect waste water from the plant)
  • At TA mall, operate side glass. Side glass is one of pump part. it is use as an indicator to observe the flow of water to the pump.
14-4-2010
  • do the unclog tray at unit 67 (sulphur plant) [T 67205]
  • process - change the tray and clean the previous tray. this is because the sulphur is extracted to the bottom of the tray.
  • unit 67 is the unit where the process of changing the sulphur state from liquid to solid is done.
  • do the bearing greasing at compressor (K53201 A/B) at unit 53
  • clean tank T53205 unit 53