2nd week
12-4-2010- Change the filter element at S53201 (cooling water) and S33251B (amine)
- Have a meeting with Mr. Bakeri Wahab. He is the executive (mechanical supervisor) at area 5.
- He gave a brief overview on area 5
- Basically area 5 contains
utilities
- steam
- water
- air
- nitrogen gas
- flare
Sulphur Recovery Unit
- amine recovery unit
- sour water treatment unit
- waste heat boiler
Cogen
- Steam turbine generator
- gas turbine generator
- cooling tower
13-4-2010- went to AMT5 (cogen). met Mr. Zuhar
- He gave an overview on cogen
- cogen contains 5 gas turbine generators, 1 steam turbine generator, and 2 cooling towers
- cogen use a combine cycle concept
- combine cycle concept is the concept where the exhaust gas from the combustion chamber in gtg is recover and it is use as a heating element in a boiler. the steam is then use to generate power at steam turbine generator (stg)
- visit blowdown pit (an underground pond used to collect waste water from the plant)
- At TA mall, operate side glass. Side glass is one of pump part. it is use as an indicator to observe the flow of water to the pump.
14-4-2010- do the unclog tray at unit 67 (sulphur plant) [T 67205]
- process - change the tray and clean the previous tray. this is because the sulphur is extracted to the bottom of the tray.
- unit 67 is the unit where the process of changing the sulphur state from liquid to solid is done.
- do the bearing greasing at compressor (K53201 A/B) at unit 53
- clean tank T53205 unit 53